• Holiday Sale on Classic Black and White Images of Route 66 Landmarks

    Click Image

  • Along Route 66

    Click to Buy Book

  • Route 66

    First 66 Book

  • December 2022
    M T W T F S S
     1234
    567891011
    12131415161718
    19202122232425
    262728293031  
  • Categories

Solar Energy in the Mojave Desert,

Dry Wash, Mojave Desert

Dry Wash, Mojave Desert

Interior secretary Ken Salazar describes his agency as the “real department of energy.” He is in charge of the vast expanses of public lands in the western United States, lands that energy producers want to exploit for their natural resources, oil, coal, natural gas, and now wind and solar.

Which brings us to the Mojave Desert, sunny and windy, and much of it owned by U.S.

There is a five year backlog of applications for 158 solar projects on 1.8 million acres of public land, which could power 29 million homes. Half the projects would be built in the Mojave Desert, where some of the land is pristine, and some not.

The White House wants to streamline the application process and create 50,000 green jobs by 2011.

Roy's Motel, Amboy, California

Roy's Motel, Amboy, California

Pacific Gas and Electric is planning a solar farm near Roy’s Motel, a classic Route 66 business and a classic Route 66 story

Buster Burris was the wrecker king of Route 66 in the Mojave. He arrived in Amboy from Texas in 1938 and went to work for Roy Crowe at his gas and service station, driving Roy’s wrecker. Buster took over the business, and added a cafe in 1945 for feed people who waited for Roy to fix their cars. Three years later he added the little cabins to bed them down while they waited for Roy to fix their cars.

Roy's Motel, Amboy, California

Roy's Motel, Amboy, California

Roy’s grew into a small city out in the desert, even though drinking water was hauled in by the Sante Fe Railroad and stored on a siding.

Because the highway is there, because the railroad is there, because Roy’s is there, Pacific Gas and Electric claims the land is no longer pristine, and a solar farm near Roy’s will not damage the environment and be far enough away from Route 66 to not spoil the view from the road.

Sen. Dianne Feinstein and David Myers of the Wildlands Conservancy feel it is way to easy to use public land for energy production and that the planned solar projects will be way too big. Myers calls it the industrialization of the desert. Feinstein wants to establish the Mother Road National Monument on 800,000 acres of the land that would connect the Mojave National Preserve to the north with the Joshua Tree National Park to the south and the Colorado River to the east. And she wants to prevent the construction of solar farms on the land.

Advertisement

Proposed National Monument in the Mojave Desert would preserve Route 66

Mojave Desert

Mojave Desert

Years ago, while I was working on Route 66, the first book, I was squatting on the edge of the road in the Mojave Desert, making a photograph of the Sleeping Beauty Rock. A tank drove out of the desert and missed me by a few feet. Gen. Pattons tank men learned desert warfare in the Mojove, during WWII. In 1982 who knows who was practicing desert warfare in the desert, but that tank sure scared me.

On another trip across the desert sixteen years later, I became intrigue with the dry rivers that run through the landscape.

Preservationists, concerned that the expansion of the Marine Corps Air Ground Combat Center at Twentynine Palms, which would cut off access to miles of Route 66 and the growth of solar farms in the Mojave would have on the proposed  Mother Road National Monument, which would protect 70 miles of old Route 66 between Needles and Ludlow and 2.4 million acres of  desert where the Bureau of Land Management owns most of the land.

Dry River, Mojave Desert

Dry River, Mojave Desert

The proposal would preserve all existing uses of the federal lands and allow for military and solar and wind farms.  It would keep the Johnson Valley Off-Highway Vehicle Area open to off-road vehicles.

However, Pacific Gas and Electric’s proposed solar generation plant on 5, 120 acres east of Amboy would spoil the view from Route 66.